This week the students leveled an area and placed 4x4 on the ground filled with blue dg. Then the students set the building in place on top of the 4x4's Next up: The fence and gate will be built next week.
The students also removed the low walls inside the chicken coop that were installed to separate the pigs from the chicken food. We feel this is no longer needed now that we have a new area for the pigs. Also, by removing the low walls it allows for better cleaning inside the coop.
No comments:
Post a Comment