Tuesday, January 22, 2019

Prepping Coop for future Rains!

Today students surveyed the area just outside and inside the coop to find the low spot or flow line of water using a survey level to determine grade. We then moved many wheel barrows full of wet hay out of the cage and began bringing in crushed granite stone to raise some portions of the floor to enable us to control the water flow.





No comments:

Post a Comment