Tuesday, May 1, 2018

Work on the Hen House

We installed the footings for the front wall of the hen house 4/24 & 4/25.  Our plan is to make a rustic hen house using the 6" x 6" posts that were donated to us.  The intent is to have a 46" low roof height sloped up to 60"enclosed in wire mesh with a solid roof.

Photos of our adventure.

Josh Lopez and Elias Hernandez using the pick.




When in doubt just point and say over there! LOL
Angel Cruz, at it.
Tyler Barkley into it.
Realy,Noah Hove working along Gwen. Then there is Colton looking on.



Eureka, I have found it. Daniel with the precious 2x4.

 Ready for some concrete.


We have a visitor. Mr. Jerry Adams our principal checking out the student work.

Footing poured. Added some 6x6 members along the bottom.

No comments:

Post a Comment