Thursday, April 5, 2018

Installation of 2nd Beam

Today the students installed the beam on the north two posts.
Step one was to check the level of the posts in relation to the existing posts
Two - cut posts as needed.
Three-add metal post caps
Four- Measure beam length in relation to existing beam and cut.
Five - Place beam into caps, check level.
Six - Nail beam connections.
Seven - Clean Up






















No comments:

Post a Comment