Step one was to check the level of the posts in relation to the existing posts
Two - cut posts as needed.
Three-add metal post caps
Four- Measure beam length in relation to existing beam and cut.
Five - Place beam into caps, check level.
Six - Nail beam connections.
Seven - Clean Up
No comments:
Post a Comment