Phase 2 work took place Jan 22-26.
During phase 2 the students installed 3 additional walkways,12 garden control valves and leveled the growing beds. Oh, yea we did have a BBQ to boot.
String set showing where the walkways are to be dug. The pipe that is showing is the PVC lines we placed during phase 1.
Almost ready for the granite backfill.
Placing stakes to line up on board for the sidewalk.
starting removal of the earth for a walkway.
Continuing the removal of earth for the walkway.
A line was stretched between two 2" x 4" boards to establish the outside of the sidewalk and the height of the sidewalk.
Sand, we need sand.
Wheelbarrow Time!
One down, two to go. Waiting on our delivery of crushed granite.
BBQ Time!
Period 4 taking time out to pose for a photo.
Period 1 setting the tone for the days work.
Everyone is involved from Period 3 with the removal of earth for the three new walkways.
Preparing the first walkway. Setting sand. We want to place a design of bricks as part of the walkway. We do not have enough bricks to do the entire walkway as in Phase 1.
BBQ
We used crushed granite from Wolfenbacker. Approx. $70 per CY. We used 2 CY. Phase 2 Done
View looking East.
Phase 2 complete. View looking West.
Phase 2 Complete!!!!
No comments:
Post a Comment